Northwood Storm Water Detention

Northwood Shopping Center Storm Water Detention project consists of removing an area of existing asphalt parking lot, excavating out soils and installing 650 l.f. of 48” diameter corrugated metal pipe (cmp) to temporarily hold storm water collected from the impervious surfaces.

LOCATION:

Royal Oak, Michigan

OWNER:

William Beaumont Hospital

CIVIL ENGINEER:

Cornerstone Engineering

CONTRACT TYPE:

Design/Build

About Us Employee Profiles Employment
Development Design Preconstruction Construction Post Construction
Office Health Care Industrial Institutional Retail Residential